Hazard Mitigation Grant Program (HMGP) DR-4223 & DR4245 Drainage Projects

Pecan Boulevard at N. 27th Street Drainage Improvements (DR-4223-014)

This project consists of storm sewer infrastructure upgrades to a section of the existing system on Pecan Boulevard. Upgrades include 4 curb inlets and the construction of a regional detention facility. The detention pond will impound and control excess flows prior to discharging back into the available downstream receiving system.

Schedule:
Design Complete:    Complete
Bid/Award:                Dec. 2018
Construction:            Jan. 2019
Progress:  Awaiting award of contract.


Kennedy Avenue Drainage Improvements (DR-4245-010)
This project consists of the installation of approximately 3,630-linear feet of storm drain pipe along Kennedy Avenue, Jackson Avenue, and Colonel Rowe Boulevard. The proposed system will tie into the existing storm sewer system on Houston Avenue. Storm drain inlets will also be installed to efficiently intercept surface runoff.

Schedule:
Design Complete:    Jan. 2019
Bid/Award:               Jan. / Feb. 2019
Construction:            Mar. 2019
Progress:   Preparing construction documents.

Westway Heights Drainage Improvements (DR-4223-016)
This project consists of the installation of approximately 7,000-linear feet of storm drain pipe within Westway Heights Subdivision. The proposed system will then connect to a proposed reinforced concrete box culvert that outfalls to the proposed storm water detention facility.

Schedule:
Design Complete:    Jan. 2019
Bid/Award:                Jan. 2019
Construction:           Mar. 2019
Progress: Preparing construction documents.