El Rancho Santa Cruz Subdivision Drainage Improvements (HMGP DR-4223-017)

This project proposes to mitigate flooding by constructing an overflow basin for additional capacity for the El Rancho Santa Cruz Drainage Ditch. The proposed basin will be built south of El Rancho Road on a vacant 14-acre tract of land owned by the City of McAllen. The project also consists of the installation of approximately 125-linear feet of reinforced concrete pipe to connect the basin to the existing storm sewer system. 

Construction Company:     2GS, LLC
Original Contract:                $320,066.88
Original Contract (Days):    90 - Working Days  

 

Construction Status: During the month of December, the pond excavation reached 80% completion.

3